Technical Service Bulletins of the 2019 Forest River Berkshire

There was one technical service bulletin issued for the 2019 Forest River Berkshire.

1 2019 Forest River Berkshire equipment TSB (Bulletin 401044)

Bulletin Date: Jun. 28, 2019
Component: Equipment.
Bulletin Summary: The l. P. Regulator was installed upside down in certain vehicles, which places the ventilation screen upward whereas it should be pointed downwards vertically. If the lp regulator vent screen remains vertically up, the vent may accumulate d
Vehicles covered in this TSB:
2019 Forest River Berkshire.

2 2019 Forest River Berkshire structure TSB (Bulletin 401044)

Bulletin Date: Jun. 28, 2019
Component: Structure.
Bulletin Summary: The l. P. Regulator was installed upside down in certain vehicles, which places the ventilation screen upward whereas it should be pointed downwards vertically. If the lp regulator vent screen remains vertically up, the vent may accumulate d
Vehicles covered in this TSB:
2019 Forest River Berkshire.