| Goshen Model | Number of Bulletins |
|---|---|
| 2016 Impulse | |
| 2012 Impulse |
| Bulletin Date: | Apr. 25, 2019 |
| Component: | Structure body |
| Bulletin Summary: | To eliminate water in steel tube and remove bulges in sidewall. |
| Vehicles covered in this TSB: |
2016 Goshen Impulse.
|
| Bulletin Date: | Nov. 12, 2012 |
| Component: | Battery cables |
| Bulletin Summary: | Inspection of battery and alternator cabling to ensure proper routing, clearance, and clamping in accordance with customer requirements, and to ensure cables are free of damage |
| Vehicles covered in this TSB: |
2012 Goshen Commander,
2012 Goshen Connection,
2012 Goshen G-force,
2012 Goshen G-force Access,
2012 Goshen G-force Ltd,
2012 Goshen Gc Ii,
2012 Goshen Gcii,
2012 Goshen Impulse,
2012 Goshen Mainstream Low Floor,
2012 Goshen Pacer,
2012 Goshen Pacer Ls,
2012 Goshen Pacer Ltd,
2012 Goshen Sentinel,
2012 Goshen Sentinel Uc.
|